Monday, 23 November 2020
Sunday, 15 November 2020
Starting boxing in the rear
Starting to box in the back at last. Thread lock on all hidden push rods etc... will probably fit the tail tomorrow.😁
Monday, 2 November 2020
Servos in!
The rear of the Zero still needs planking but I can't do this until the controls for the rudder and elevator have been installed. Tonight I have installed the two large servos for these control surfaces. These servos will move the 6mm diameter carbon push rods which need connecting up before the planking can continue.
Subscribe to:
Posts (Atom)